中石化第四建设有限公司对于大功率离心式、往复式和螺杆压缩机、各种机泵、透平、电机和烟机等机电设备的安装、调试改造,具有丰富的施工经验,具备异地同时安装40台大型机组的施工能力。近几年,先后在南京扬子—巴斯夫60万吨/年乙烯装置大型裂解气压缩机组、大庆高压聚乙烯装置大型高压往复式压缩机组、哈尔滨炼油厂250万吨/年催化裂解装置烟气轮机-轴流式主风机同轴器机组、天津100万吨/年乙烯工程乙烯装置裂解汽GB201压缩机组、内蒙古中天合创项目煤气化装置磨煤机安装等大型机组安装、调试中取得骄人业绩,均实现一次试车成功。
Sinopec Fourth Construction Co., Ltd. has rich construction experience in the installation, commissioning, and transformation of high-power centrifugal, reciprocating, and screw compressors, various pumps, turbines, motors, and flue gas turbines, as well as other mechanical and electrical equipment. It has the construction ability to simultaneously install 40 large units in different locations. In recent years, we have successively installed large-scale cracking gas compressor units in the Nanjing Yangzi BASF 600000 ton/year ethylene plant, large-scale high-pressure reciprocating compressor units in the Daqing high-pressure polyethylene plant, flue gas turbine axial flow main fan coaxial unit in the Harbin Refinery 2.5 million ton/year catalytic cracking plant, and cracking gas GB201 compressor units in the Tianjin 1 million ton/year ethylene project ethylene plant The Inner Mongolia Zhongtian Hechuang project has achieved remarkable results in the installation and commissioning of large-scale units such as coal gasification equipment and coal mills, all of which have achieved a successful trial run.

天津100万吨乙烯及配套工程乙烯装置裂解汽GB201压缩机组安装

中天合创项目煤气化装置磨煤机安装

石家庄项目蜡油加氢循环氢压缩机组

主风机粗旋安装